Morton & Morton Design Services, PLLC

Traffic Engineering & Site Development
Home     About Us     Contact Us     Site Map     Project Experience      
NCDOT
                                          

      T.I.P. (Transportation Improvement Projects)

                            

     B-3451, US 15-501 in Durham County, NC: preparation of final 

    traffic signal designs, and two (2) temporary  traffic signal

    designs with  cable routing plans for four (4)  intersections.

         

    R-2214A, US 25 in Henderson County, NC preparation of eight

    (8) final traffic signal designs and ten (10) temporary  traffic

    signal designs. Designs were developed  for use with metal

     poles and 2070 controller equipment. 

     

    R-2907, NC 55 in Wake County, NC: preparation of traffic

    signal designs and cable routing plans for four intersections.

    Designs were developed for use with Mastarms, Metal poles,

    Loop Emulation and 170 controller equipment.

 

    R-0609 H, US 311 in Guilford County, NC: preparation of traffic

    signal designs and cable routing plans for eleven Intersections.

    Designs were developed for five (5) interchanges.  Designs

    were developed for use with wood poles and TS2 controller

    equipment.

 

 

   Design Build Projects - NCDOT - (T.I.P.)

 

   I-3807 - 4 Final Signal Designs - 4 Temporary Signals Designs

   R-4463B- 3 Final Signal Designs - 3 Temporary Signals  

   Designs

   B-3851 - 2 Final Signal Designs - 5 Temporary Signals Designs

 

   

Additional Projects

 

    WBS 36552, City of Reidsville, Rockingham County, NC:

    preparation of traffic signal designs, cable routing plans, and

    utility make-ready plans for twenty two (22) intersections.

 

    US 74/US 220 in Rockingham, Richmond County, NC:

    developed and implemented closed loop signal system and

    timebased signal system for these arterials.

 

    US 158 in Kitty Hawk, Dare County, NC: developed and

    implemented seasonal timing strategies and a closed loop

    signal system on US 158.

 

    US 29-74 in Gastonia, Gaston County, NC: developed

    emergency timing Plans for the Gastonia Closed Loop

    Signal System in conjunction with the Incident Management

    Program for Interstate 85.

 

    NC 51-US 521 in Pineville, Mecklenburg County, NC:

    developed and implemented one of the states first Closed Loop

    Signal Systems.

 

   US 70 Corridor from Raleigh, Wake County, NC to Morehead

   City, Carteret County, NC: developed and implemented volume

   density timing strategies to improve traffic progression from

   Raleigh to the beach.

Recent Projects by M&MDS

 

                The Shoppes @ 10.5 Development 

                          Nags Head, Dare County, NC

 

Traffic Signal Design  for the intersection of US 158 (Croatan Hwy) at Adams Lane/Entrance to Shoppes @ 10.5 development. Included cable routing plans, and pavement marking plans.

Designed for Flashing Yellow Arrow operation.

 

Traffic Signal Systems - implemented signal system timing for an existing closed loop signal system in Hillsborough and Nags Head, NC.  Our personel  programmed controller timings and field adjusted signal system coordination for both existing closed loop signal systems. 

 

Traffic Impact Analysis  for a Food Lion Supermarket, State Employees Credit Union, Retail Specialty Shops and a small branch bank. Peak hour traffic counts collected for ten (10) intersections.

 

Traffic Control Plans  for lane closure scenarios along several high traffic volume arterials in Fort Bragg, NC for Pike Electric, Inc. to install 65 Progress Energy power structures.

 

City of Raleigh Traffic Signal Projects

 

Hillsborough Street and Boylan Avenue - Upgrade

New Hope Road and Corporation Parkway (South) - New

Dixie Trail and Fred A. Olds Elementary School - New Ped Signal

Forest Pines Dr. and New Falls of Neuse Rd. - New

Six Forks Road and I-440 EB Ramp - Upgrade

Western Blvd. and Powell Drive - Upgrade

Western Blvd. and Clanton Street - New

Western Blvd. and Gorman Street - Upgrade

Western Blvd. and Avent Ferry Road - Upgrade

Western Blvd. and Pullen Road - New

 

City of Durham Projects

 

Traffic Impact Analysis  for a Worship Center located in the southwest quadrant of  the intersection of Page Road and Lumley Road in eastern Durham County, NC. 

 

Triangle Transit Authority Regional Rail Project  Section 2 - Durham Line in Durham, NC. - Preliminary traffic signal designs for seven (7) intersections including R/R premption timing. Three (3) preliminary temporary traffic signal designs.

 

Other Projects

 

Traffic Impact Analysis  for the Barton Development, a 370 single -family housing development near Creedmoor, NC.  Peak hour traffic counts collected for three (3) intersections.  

 

Signal System Timing/Implementation

Six Forks Road (north of I-440)

US 70 Bus. (Glenwood Ave. west of Crabtree Valley-I-440

US 401 (South Saunders Street)

Western Blvd. adjacent to NC State University